Billy Swails Boulevard 4B

BSB 4B
Billy Swails Blvd Project Page Banner_1350x367

Description

Billy Swails Boulevard 4B is the final roadway segment that would complete what was originally named the Hungryneck Boulevard corridor, a parallel route to US 17 and Rifle Range Road. The anticipated cross-section is a two-lane divided roadway with a landscaped median, turn lanes and bike and pedestrian facilities. The project would join the existing Sweetgrass Basket Parkway on the west to the existing portion of Billy Swails Boulevard to the east.

Status

The project is currently undergoing an environmental review under the NEPA process. An alignment decision has not been made at this time. Engineering work is ongoing.

Schedule

  • Complete Design:  February 2022
  • Right of Way Acquisition: March 2022
  • Start Construction:  March 2022
  • Complete Construction:  March 2023

BsB 4.7.21

Click here to enlarge

Cost

$14,568,497

Resources

Billy Swails Boulevard Public Information Meeting Handout (5/7/19)

Billy Swails Boulevard Public Information Meeting Comment Card (5/7/19)

Billy Swails Boulevard Public Meeting Notice (4/25/19)

Billy Swails Boulevard Public Meeting Notice (2/27/18)

Billy Swails Boulevard Aerial Display (2/27/18)

Billy Swails Boulevard Public Information Meeting Handout (2/27/18)

Billy Swails Boulevard Network Display (2/27/18)


Contact

Paul Lykins, Project Engineer 

  • Ph: (843) 856-3080 
  • Email